Blakeslee Warehouse – Blakeslee, PA
Project Manager: Justin Popolis
Site Superintendent: Greg Rhoades
Project Owner: Exeter Property Group
Architect: OGP Architects, LLP
Location: 198 Commercial Blvd. Blakeslee, PA
Job Type: HVAC Project - New Construction
Square Footage: 510,000
Time Line: August, 2019 - September, 2019
HVAC DIVISION PROJECT
Tenant improvement to a 510,510 sq. ft. heated warehouse with summer ventilation including one main office space and two remote offices.
This project required the use of a helicopter to set the rooftop units
“”
Throughout both phases (of the Diamond Credit Union headquarters renovation) the Ames team remained fully engaged with our design team. They showed a strong respect for the design intent and were always proactive in addressing field conditions, coordinating trades, and implementing architectural details with precision. Their communication was clear and consistent, helping to ensure that changes were addressed efficiently and that design integrity was never compromised.
Larry W. Smith - President, Olsen Design Studio